LZMLifezone Metals Limited
Price
-35%1YEnd-of-day closes, not the intraday tick.
A mixed picture: the questions disagree
A flag to check, growth fading, the market undecided.
Our primary asset is the Kabanga Nickel Project, which is located in north-west Tanzania. Based on the 2024 Mineral Resource and 2025 Reserve Estimates detailed in the Feasibility Study, we believe Kabanga comprises one of the world’s largest and highest-grade undeveloped nickel sulfide deposits. Our second project which is a US based recycling partnership with Glencore, would utilize our Hydromet Technology to recycle the PGM recovered from spent Autocats.
In the company’s own words · 20-F filed Mar 19, 2026 · SEC EDGAR
Charts
As reported to the SEC, without any scoring.
Lifezone Metals Limited (LZM) reported revenue of $732K in H2 2025 (quarter ended Dec 31, 2025), down 25% from the same quarter a year earlier. That came with a gross margin of 51% and net loss of $16M. For the full year FY2025, revenue was $1.1M (−55% year on year) and net income −$14M.
Why these answers
Each answer with the checks it was read from. Open one for the numbers.
Conflicts between checks are named, never averaged, and thin data says so.
Other Industrial Metals & Mining
Ranks #14 of 22 by RyuScore